Difficult flow of material inside the commuter due to encrustations and concretions.
Reduction in plant productivity due to lack of material and plant stops to clean chutes and connection channels to restore the flow of material.
Installation of clusters of small AIRFLASH LIGHT cannons (5LT) with simultaneous activation. The shock wave storm thus generated moves the material, making it slide naturally towards the extraction point and preventing the formation of encrustations and blocks which would otherwise reduce the passage section of the channel. Simultaneous activation of up to 6 firing points is possible thanks to the STORM multi-activation valve. To control the activation of the firing cycles, a timer (digital timer) has been inserted directly on the STORM valve.