BARRA PROJECT Case History

Elimination of blockages and material blockages in the connection channel
Sector: CEMENT
Problem:

Material blocked inside the connection channel and chutes for moving material within the production chain

Solution

Installation of a small AIRFLASH LIGHT and CAPPUCCINO cannon system (0.5÷5LT) with simultaneous activation thanks to the STORM valve. A storm of shock waves is thus generated which moves the material, making it slide towards the extraction point and preventing the formation of encrustations and blocks which would otherwise reduce the passage section of the channel.
The STORM activation cannon system is designed to have a low maintenance frequency and purely pneumatic activation so as to reduce the need for periodic maintenance to a minimum (ordinary maintenance every 18/24 months).

Elimination of blockages and material blockages in the connection channel

Discover the AIRFLASH products used

GALLERY Case history
Main
industries There are no application limits
  • Cement
  • Food industry
  • Milling industry
  • Food and petfood
  • Glassware
  • Mining and quarry
  • Premixed industry
  • Wood / paper / cardboard
  • Livestock industry
  • Waste treatment
  • Energy production
  • Concrete industries
  • Plaster industries
  • Building materials
Case History